dp dual trac 20 assembly instructions full 

Contact Support Team

This is the machine's defining feature and the trickiest part of the assembly.

Before using the machine for an actual workout, perform a comprehensive safety check:

: Features a 70kg (approx. 154 lbs) variable resistance stack. Dimensions

Route the cable straight back along the top of the crossmember.

If the weight stack is lifted off the ground at rest, adjust the cable tensioner.

DP Dual Trac 20 Assembly Instructions: The Complete Step-by-Step Guide

Route the cable over the rear pulley wheel of the top crossmember, then feed it straight down. Attach this end securely to the top plate of the weight stack using the cable-ending hook and bolt. Cable 2: The Low Pulley / Dual Trac System

The two vertical posts (left and right) support the weight stack and the pull‑up bar.

Connect one end of the shorter cable to the base of the weight carriage slide. Feed it underneath the lowest base pulley.

Secure the assembled uprights (11) to the base, utilizing M10 x 90mm carriage bolts (40), M5 x 19mm screws (50), and nylon locknuts (57).

Attach the arm pads using the 50mm bolts and washers (61). Step 5: Installing Leg Developer and Cable/Pulley System

The vertical "Uprights" (which hold the weight stack) and the "Console Masts" (which hold the upper pull bars) are the next priority.

Clear a flat, level area at least 8' x 6' for assembly and operation.

: Standard 8mm and larger adjustable wrenches for various bolts. Screwdrivers : A Phillips head for smaller cap screws and covers. Flashlight

: The unit stands approximately 69" H x 96" L x 38" W when fully assembled and can be folded for storage. Maintenance

Dp Dual Trac 20 Assembly Instructions Full New! [ RECOMMENDED | 2025 ]

This is the machine's defining feature and the trickiest part of the assembly.

Before using the machine for an actual workout, perform a comprehensive safety check:

: Features a 70kg (approx. 154 lbs) variable resistance stack. Dimensions

Route the cable straight back along the top of the crossmember.

If the weight stack is lifted off the ground at rest, adjust the cable tensioner.

DP Dual Trac 20 Assembly Instructions: The Complete Step-by-Step Guide

Route the cable over the rear pulley wheel of the top crossmember, then feed it straight down. Attach this end securely to the top plate of the weight stack using the cable-ending hook and bolt. Cable 2: The Low Pulley / Dual Trac System

The two vertical posts (left and right) support the weight stack and the pull‑up bar.

Connect one end of the shorter cable to the base of the weight carriage slide. Feed it underneath the lowest base pulley.

Secure the assembled uprights (11) to the base, utilizing M10 x 90mm carriage bolts (40), M5 x 19mm screws (50), and nylon locknuts (57).

Attach the arm pads using the 50mm bolts and washers (61). Step 5: Installing Leg Developer and Cable/Pulley System

The vertical "Uprights" (which hold the weight stack) and the "Console Masts" (which hold the upper pull bars) are the next priority.

Clear a flat, level area at least 8' x 6' for assembly and operation.

: Standard 8mm and larger adjustable wrenches for various bolts. Screwdrivers : A Phillips head for smaller cap screws and covers. Flashlight

: The unit stands approximately 69" H x 96" L x 38" W when fully assembled and can be folded for storage. Maintenance