The DSR 2015-16 was released during a unique economic period in India:
| Equipment | Capacity | Rate per day (₹) | |-----------|----------|------------------| | Hydraulic excavator | 0.9 cum | 7,500 | | Dozer D-50 | – | 8,000 | | Vibratory roller | 8-10 tonnes | 6,200 | | Concrete mixer (diesel) | 200 liters | 1,200 | | Water tanker | 6,000 liters | 1,800 |
₹12.00 per cum
The PWD DSR 2015-16 did not follow a "one-size-fits-all" approach. It adjusted for various logistical and geographical factors:
| Use Case | Appropriate? | |----------|---------------| | Arbitration / dispute for 2015-18 contracts | ✅ Yes (with escalation) | | Old repair work estimates (pre-2016 designs) | ✅ With index | | Current govt. tender estimate | ❌ No – use latest DSR | | Private cost comparison (historical) | ✅ Yes | | Student / exam reference (estimating practice) | ✅ Yes | Pwd Dsr 2015-16 Maharashtra
Charges for minor minerals (rubble, murum, soil) are added separately based on Revenue Department notifications.
| Item Description | Unit | Rate (Pune District) – 2015-16 | Remarks | |---|---|---|---| | Excavation in ordinary soil (depth up to 1.5m) | cum | ₹ 85 – ₹ 110 | Manual or mechanical as per clause | | Providing PCC 1:4:8 (40mm aggregate) | cum | ₹ 3,200 – ₹ 3,500 | Including cost of materials and curing | | RCC M20 grade (1:1.5:3) with steel reinforcement | cum | ₹ 5,800 – ₹ 6,200 | Excluding cost of steel | | Reinforcement steel (Fe 500) | MT | ₹ 48,000 – ₹ 52,000 | Including cutting, bending, binding | | Brick masonry in CM 1:6 (common burnt clay bricks) | cum | ₹ 4,500 – ₹ 5,000 | Including scaffolding | | Plaster 12mm thick 1:4 (cement:sand) | sqm | ₹ 85 – ₹ 105 | Smooth finish | | Granular Sub-Base (GSB) | cum | ₹ 650 – ₹ 750 | Including watering and rolling | | Bituminous Concrete (BC) with 60/70 grade bitumen | MT | ₹ 7,500 – ₹ 8,200 | Includes hot mixing and laying | | Whitewashing / Color washing (two coats) | sqm | ₹ 18 – ₹ 25 | Including surface preparation |
A critical feature was that rates were not state-wide. Different "circles" or regions had their own specific DSRs to reflect local material and labor costs. The 2015-16 edition provided distinct schedules for circles such as Pune, Nagpur, Nashik, Mumbai Presidency, and others.
: The schedule provides standardized percentage increases for works in specialized zones: Tribal and Hilly Areas The DSR 2015-16 was released during a unique
15% increase due to labor and logistics constraints. Taxes and Ancillary Charges
Surfacing items including Bituminous Concrete (BC) and Dense Bituminous Macadam (DBM). 3. Bridge and Cross-Drainage Works
Mitigating corruption risks during the vendor bidding process by introducing a pre-approved baseline price. Key Technical Parameters and Material Base Rates
Comprehensive Guide to PWD DSR 2015-16 Maharashtra: A Cornerstone for Civil Engineering Projects tender estimate | ❌ No – use latest
Approximately ₹47,250 to ₹47,400 per M.T.. 2. Labor and Machinery Hire Charges
The 2015-16 dataset functions through distinct pricing buckets designed to calculate precise structural layouts under varying geographic conditions. Understanding these core pillars is vital for any quantitative engineer or contractor preparing a public contract bid. 1. Basic Material Rates
: These rates generally came into effect around September 1, 2015 , and applied to various regions including Nagpur, Wardha, and Chandrapur .